Basically, last Friday, we had started to clean all our material and plan to do the outer part of our design which needed to be attached on our wind chime. I and David have clean all up and waited for it to dry. After that, we can start assemble the shell of our product.
After that, we meet with our team members in the concourse and discussed on the proper ways in starting to assemble our products. It seems pretty hard as we need to implement step by step with no error including in it. So, we decide to start off with the beer cap and following by others in fixing it together.
Then, we started our wind chime product by using the materials that we had collect and make them.
This lady think she so pro and snatch my work....see...at last also need people to help with it..
David: Noob la...
Wc: Wad to do?
Yi Xin: Diam la!
Okay, then we started to used our thread string in piercing throught the hole of the beer cap that we had hammered and attached it to the surface of the bottle making a round shape.
It really took a very long time because we need to measure the size of the hole in order for the string to go in and form a circle shape. Ming Ji direct us all in the process of the designing which we appoint him as like our devil advocate ha ha. At last, we manage to attached the caps around the bottle of the body thanks to Yuan Yuan for fixing it and it is a relief!!
Thats all for now. Next, we going to implement and upgrade more on our wind chime and will be completed soon. Awaits!!!
No comments:
Post a Comment